What is Merge Conflicts?
No Answer is Posted For this Question
Be the First to Post Answer
When I open a project in Visual Basic that is under Source Code control, does Visual SourceSafe get the latest version of the project?
How do I remove a label?
What about other product integrations?
Can I use VSS on Unix or Mac systems?
What was fixed by Service Pack 3 for Visual Studio?
How can I lock and unlock the VSS database prior to running Analyze or backing up the database?
How do I find all changes between two dates?
I want to prepare a patch installation for my company. I need all the files which have been modified since Jan 09. I have taken the history of project in VSS, for date range 01Jan09 to today. Now whats the procedure of getting all those files to my local directory, which is being used for a patch install preparation. Thanks.
How can I put revision history information in the source files each time I check in a file?
Does VSS OLE Automation support administrative functions?
Is there an issue/bug tracking tool that integrates with SourceSafe?
Is it necessary to check out the project file when I only want to edit one of the forms contained in the project file?