Structural wall & slab : Binding wire fixing is
alternatively spacing is correct or wrong?. binding wire
fixing is all spacing is must or not?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Architecture Design AllOther Interview Questions

How to attend eye testing & tell me about your self,

0 Answers  


What is water cement ratio?

1 Answers   MIPL,


why you want to become artictecture

0 Answers   JP Group,


3. Assume a building having three floor and a lift, the lift has the following buttons: a. G (for ground floor) b. 1 (for first floor) c. 2 (for the second floor) d. 3 (for the 3rd floor) e. Stop (Stop button to stop the lift in emergency) Assume currently the lift is in the ground floor; write an algorithm for the lift to work.

1 Answers   Infotech,


what type of mapping is most used in maya production house?

0 Answers  






Do you have any ideas on how we could build a single vault and use lower embodied energy products?

1 Answers  


How i can calculate material for 1000 sq foot plot.

0 Answers  


RCC colums of 15"X9" each, roof height 20.5'ft, total pillars 36 nons. Span between pillar to pillar is 16/20/20 length wise and 16/14 width wise. Total Slab area 8000 sft and plinth area is 1900 sft. beams are 12"X9". kindly calculate load factor per sqft.

1 Answers   ITI,


Is there any information about building environmentally in the retarded South. (SC)?

1 Answers  


how much steel is required for 1100 sqft of slab (area 25*43 ) & we need to consrtuct 3 floor

3 Answers  


What do we mean by domestic architecture artifacts?

1 Answers  


Structural wall & slab : Binding wire fixing is alternatively spacing is correct or wrong?. binding wire fixing is all spacing is must or not?

0 Answers  


Categories
  • Interior Design Interview Questions Interior Design (21)
  • Architecture Design AllOther Interview Questions Architecture Design AllOther (185)