Can we transfer balance on gl a/c to another Gl a/c if what is the process steps and tr code?
1 4151We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.
1195Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.
1283Post New SK Engineering Interview Questions
What are static member functions?
before transformer oil dielectric strenght tests are taken the oil should be allowed to settle to remove option 1 air bubbles 2 gasses 3 contamination 4 water
What is the prerequisites to create an opportunity?
What is the difference between the shore and off-shore outsourcing? : bpo
what is object slice?
Which interfaces are implemented by enumset?
1.For a single module how many builds are possible 2.what will be the max or min time to finish up an single module
What is the managed path?
How to protect sensitive loads such as Dosing pumps inside a factory from voltage surge/voltage fluctuation.
Can we record using all the modes in a single script? Explanation with example is appreciated
Why did you decide to pursue your career at Office Depot?
What are different types of valves?
Difference between standard cost and variable cost.
What type of operation is needed when passing values through a form or an url?
hi friends, dis is ramana reddy.i have been workining in bulk drugs as QC chemist.i would like 2 change d company.i want sample RESUME,OFFER LETTER,APPOINTMENT LETTER,PAY SLIP.if any body has these documents,pls send 2 my mail id i.e ramanareddy.sdpl@ymail.com