hi can i download group 2 study material on net or is there any site the above mentionred info available
47 79119Post New Inscripts Interview Questions
Explain how do we use rsa for both authentication and secrecy?
How to modify one image from one layer to another layer?
What is difference between length and length() method in java ?
What are the major apis available in apache kafka?
what is access key? how it is obtained? i was asked access key while creating data transfer routine
What does := mean in pl sql?
What are R/3 Basis configurations?
What is a pass in bubble sort?
What are allotropes?
Why is actionform a base class rather than an interface?
In a Furnace arch pressure is more than Hearth pressure,then how flue gas travels to stack
self supporting course and sandwich course are same
What is zend helpers?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
What is nfs?