Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Crompton Greaves interview questions (13)
  • Crompton Greaves placement papers (2)
  • Crompton Greaves technical test questions (8)



Crompton Greaves Mechanical Engineering Interview Questions
Questions Answers Views Company eMail

when a solid shaft is subjected to tension its linear dimension changes equaly as its lateral dimension,then what will be its poissons ratio?

7 5409

Post New Crompton Greaves Mechanical Engineering Interview Questions




Un-Answered Questions

what the reason to switch frm insurance industry to IT industry.

766


. how will effect of water injection on turbine load and corresponding MW output(not water washing)

682


what are the launch find options of instance?

670


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

1288


What is Managed (also known as client or station) mode?

392






A ray hit a smooth regular surface at an angle of 20 from the normal. Calculate : 1. The angle btw the incident and reflection ray. 2. The angle of deviation.

597


when we have to use UPF wattmeter and LPF wattmeter? what is the difference between UPF and LPF wattmeter in terms of construction?

932


How to Extract Icons ?

551


Hi, I have advance payment scenario where customer want advance payment cannot be used against another sales order and against any credit limit. Let me put one example. Customer X is having credit limit of 1000 USD, if my client is received customized product order then he will take advance for this special order but customer X is already enjoying credit limit of 1000 USD. In this scenario my client wants advance payment received cannot use against any sales order and against any credit limit. If I will post advance payment in F-29 then customer credit exposure will decrease against credit limit in FD32 which will affect normal sales order credit limit. Here customer does not want to utilize advance payment against credit limit of customer which is use for normal sales order. Please suggest

2308


How to determine stage of Automatic Power factor controlling Relay(Apfcr)?

787


what u know about genpact.

1009


whats the allowed tolerance of pipe to pipe butt joint mismatching

826


in which website , i can able to get the electrical basics.?????????????

582


What is the use of white metal?

823


what is the need of a sealed class when we are having a structure

1114






Crompton Greaves Mechanical Engineering Interview Questions
  • Test Cases (1)
  • Mechanical Engineering (1)
  • Electrical Engineering (14)
  • Electronics Communications (1)
  • Industrial Engineering (1)
  • Engineering AllOther (1)
  • Marketing Sales (1)
  • Placement Papers (2)
  • ASP.NET Code (1)