Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • CIT interview questions (3)



CIT Civil Engineering Interview Questions
Questions Answers Views Company eMail

what is the difference between weir and a barrage

12 31749

Post New CIT Civil Engineering Interview Questions



Un-Answered Questions

what is the difference between active power and reactive power and apparant power in practical as well as theoritical

736


what stock transfer applicable in sister concern unit.

1080


What is excitation current and voltage in hydro power plant ?

1336


what convarts RRA in alternator ,AC to DC or DC to AC,

2990


hai iam selected in po exam in allahabad bank . my interview date is 02-06-2009. so plese send me some sample question on my email. my email is nitinbikhani@yahoo.com

661






I have received my ielts result n i have scored folloeing score Listening: 5.5 Reading: 4.5 Writing: 5.5 Speaking:6.5 Overall: 5.5 Can I apply for student visa ? Is it there any chance to get the student visa ? Please reply as soon as possiblešŸ˜Š

267


I want to crate my personal website. I am having my website on webs.com which provide some space but it templete based. I want to gain free web space and plz tell me how to custmize it....plz suggest me... Thanks...

1219


what is semi&full custom difference b/w these two?

917


What is the formula for calculating impedance of transformers connected parallel at fault level 50KA?

888


Is it true that in the 3 phase transformer, the limbs of the core are at 45 dgrees to each other. if true, why?

862


Hi, I have advance payment scenario where customer want advance payment cannot be used against another sales order and against any credit limit. Let me put one example. Customer X is having credit limit of 1000 USD, if my client is received customized product order then he will take advance for this special order but customer X is already enjoying credit limit of 1000 USD. In this scenario my client wants advance payment received cannot use against any sales order and against any credit limit. If I will post advance payment in F-29 then customer credit exposure will decrease against credit limit in FD32 which will affect normal sales order credit limit. Here customer does not want to utilize advance payment against credit limit of customer which is use for normal sales order. Please suggest

2884


Write code for the following in ASP a)Display attributes of a file b) File copy c) get disk capacity.

923


I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?

2565


what is differred tax liability? explain in detail with some example.

1298


7. What is performance tuning?

898






CIT Civil Engineering Interview Questions
  • Project Management (1)
  • Civil Engineering (1)
  • General Knowledge_Current Affairs (1)