Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • BPCL Bharat Petroleum aptitute test questions (2)
  • BPCL Bharat Petroleum interview questions (13)
  • BPCL Bharat Petroleum placement papers (2)
  • BPCL Bharat Petroleum technical test questions (6)



BPCL Bharat Petroleum SAP ABAP Interview Questions
Questions Answers Views Company eMail

How many rediobutton groups can be there in a module pool program and in a report?

2 5050

Post New BPCL Bharat Petroleum SAP ABAP Interview Questions



Un-Answered Questions

hiiiii sir ..tell me the written test pattern for symphony teleca.....pleaseee

1078


How will you schedule the job in background?

784


Material Determination Issue while posting billing document. I am taking about the standard process of SAP. Just try entry with Outcome as A while defining substitute reason and then process the order. It will show both the old and new material with item category as TAX and TAPS respectively. TAX for non- stock item- means as of now the material is not available. TAPS- the new material which has replaced the old material. Now, if you will see the configuration of item category TAX and TAPS in IDES, it would be more clearer as I mentioned in the first update. The only issue is - I am facing a problem in billing. Now if you re-consider my post, I guess it would be more clearer. However, the issue is that in billing its not showing the right price. Please suggest. Configuration - Item category- TAX- Old material. Billing relevance- A Stats- X Pricing- NO Item Category- TAPS- New materail Billing Relevance- A Stats- NO Pricing- Yes Because I want both the material in billing, so billing relevance is A. And I want the price of new material so for TAPS pricing - Yes. But every time I am trying system is taking the price of TAX. Not sure why? If I make it as vice- verse, thinking lets take the price of new material, now the system is taking the price of old .

934


Please write the Code of simple javascript calculator withot eval() function

797


Which test will be more severe for VCB?

1384






all questions related to instrument technician in any offshore oil and gas company.

15235


What Are The Characteristics Of Modern Accounting?

2851


What are the Rules of Desktop Publishing?

936


how mass curve differs from hydrograph.

371


I will complete chemical engg next yr from a deemed university. Earlier I dropped 2 yrs after std 12th. Then I got 2 yr back while completing engg, due to reasons beyond my control. Will I face any problem while applying for job. More so not many core companies come to our collg for placement. So i want to know which all companies can I apply to get a job?

876


The torque transmitted by a clutch is given by a) T = μWR b) T = μ/WR c) T = μW/R d) T = 1/μWR

38


one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance

360


Explain ODBC Constraints ?

721


How would you activate animation control?

640


1 *2 1*3 *2*4 1*3*5 *2*4*6

465






BPCL Bharat Petroleum SAP ABAP Interview Questions
  • STL (1)
  • SAP ABAP (1)
  • General Chemistry (1)
  • Civil Engineering (1)
  • Mechanical Engineering (5)
  • Electrical Engineering (2)
  • Electronics Communications (1)
  • Chemical Engineering (1)
  • Instrumentation (1)
  • General Knowledge_Current Affairs (4)
  • Energy Oil Gas (1)
  • Everything Else AllOther (1)
  • General Aptitude (1)
  • Placement Papers (2)