Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • AVS interview questions (6)



AVS Civil Engineering Interview Questions
Questions Answers Views Company eMail

what are the types of design? which type of method is used at what type of design & why?

966

1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40

1257

What is the ratio of materials used for M10, M15, M20 & M25 grades of concrete? Also specify the quantity of water used in each grade & how to calculate it?

4 15744

how to calculate sump capacity

2 1978

Post New AVS Civil Engineering Interview Questions



Un-Answered Questions

previous year paper of ntpc bhel for degree in electrical enng

1854


A 30 year old woman requests termination of pregnancy at 7 weeks gestation. How you will counsel her and discuss the available options for pregnancy termination.

1187


when will give ta

770


How to map testcases with requirements in test lab?

1016


How to code these statements in JCL: CLEANUP INITIAL(NO) RESTART(NO) DYNALLOC(NO) job definition..?

819






why you consider fit for the post applied for?

1717


How We know we are liable for Profession Tax liability. I have an optics shop & I want PT Number so what should i do?

947


When Recovery scenario actually starts while testing the application?

739


how does a bank finance working capital

568


what is the effect of duration of earth quake on framed structures ?

833


what is the ct-1 sale? if ct-1 bond is misplaced what is the procedure for applying for new bond.

814


Deposited Rs 25000 in Canara Bank of ABC co towards dealership deposit thru our SBH Bank Pass necessary entry

751


1.int a=10; 2.int b=20; 3. //write here 4.b=30; Write code at line 3 so that when the value of b is changed variable a should automatically change with same value as b. 5.

754


What is CCT (Correlated Color Temperature) ?

467


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

3629






AVS Civil Engineering Interview Questions
  • Manual Testing (1)
  • Civil Engineering (4)
  • Electrical Engineering (1)