Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Apex interview questions (34)
  • Apex technical test questions (3)



Apex Taxation Interview Questions
Questions Answers Views Company eMail

what is the difference between banker cheque and cheque?

7 39867

What is the applicable rate of service tax on work of construction company i.e. real estate developer company plz improve my knowledge about it.

11 25588

Why Issue a C form to seller & what is form no.49

8 24704

What is WCT TDS? who is liable to deduct the WCT TDS?

36 125286

What is PLA Account & briefly say the central excise returns, due dates & entries

8 52415

Post New Apex Taxation Interview Questions



Un-Answered Questions

Difference between DataGid and Girdview? Difference b/w .Net 2.0, 3.0 and 3.5 ? Diff b/w dispose & Finialize Methods?

1282


How much cement,sand,bricks and water needed for 1square metre brick work?

469


what is education Cess.

908


Purposes, features and functions of windows 98 and xp. i am struggling with this because i have to compare their strenths and weaknesses, please can i get help?

2737


My balance sheet is tallied. But there is a difference of RO 1 in cash flow. How to adjust ?

755






The last callback in the lifecycle of an activity is onDestroy(). The system calls this method on your activity as the final signal that your activity instance is being completely removed from the system memory. Usually, the system will call onPause() and onStop() before calling onDestroy(). Describe a scenario, though, where onPause() and onStop() would not be invoked.

1092


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1123


interface an 8-pin switch with 8085 microprocessor located at 0AAH and LEDs at port 55H, draw the circuit diagram. Write down a program to read the switches and do the following: > if the parity of the switch is odd, start counting upward until it reaches 0FFH. > if the parity of the switch is even, start counting downwards until it reaches 00H.

1411


What is a SID table and advantages?

854


Synchronous and asynchronous methods in BDC ?

896


Is there a separate QVCS API library available for embedding version control into a non-QVCS application?

900


describe a type when u anticipated potential problems and development of preventive measure.

702


hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard

822


sorting java array

451


how to calculate orifice sizing? and tell me if pipe size bet 50mm t0 200mm then we can use pipe flange??? and above 250mm pipe size should i use D & D/2 Flange? is it right or wrong?

705






Apex Taxation Interview Questions
  • SNMP (1)
  • QTP (3)
  • Manual Testing (3)
  • Data Warehouse General (1)
  • Inorganic Chemistry (1)
  • Analytical Chemistry (9)
  • Pharmacy (1)
  • Civil Engineering (5)
  • Marketing Sales (1)
  • Banking Finance (1)
  • Taxation (5)
  • Call Centre AllOther (2)
  • RRB (1)
  • General Knowledge_Current Affairs (1)
  • General Aptitude (1)
  • H1B Visa (1)