Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • APC interview questions (16)
  • APC technical test questions (2)



APC L1 Visa Interview Questions
Questions Answers Views Company eMail

In ups how can calculate the battery backup time

12 29534

Post New APC L1 Visa Interview Questions



Un-Answered Questions

Do not use more than 3 nested IF. Use Evaluate statement in case of more IF required. Please give a detail explantion besides readability and clarity for Evaluate stmt.

831


Why do we use copper cable for HT Supply and why not Aluminium?

861


what is cmm level 5 company? like that cmm level 4, 3....

1177


how can i reduce sparking without stepdowning the voltage

1386


HOW MANY BASED RATE AND OTHER RELETIVE RATES.

994






What is the advantage of CO-PA?

903


How should I begin a conversation that I need a change in the job to a known person in his organisation?

774


What is a Fiscal policy? State its features?

2


What is the function of a Amazon controller?

74


I want to prepare for PSU's bt i dont know how many PSU's are open for computer science students and what is the competition level for these. So if anybody knows this please guide me through this.

1417


What is inverted file ?

460


What is JacORB?

2537


The Tabula Manufacturing Company has been in business for one month. At the end of month the company had the following accounts: Materials used K 5 000.00 Direct labour 10 000.00 Indirect labour 3 000.00 Indirect materials 2 000.00 Labour fringe benefits 1 000.00 Supervisor’s salary 1 000.00 Depreciation Machinery 2 000.00 Miscellaneous factory overhead 1 000.00 Heat and light 500.00 Insurance on plant 1 500.00 The company processed two jobs during the month with costs as follows: Job 101 Job 102 Materials cost K3 000.00 K2 000.00 Direct labour cost K6 000.00 K4 000.00 Direct labour hours 4 000.00 3 000.00 Machine hours 2 000.00 1 000.00 The company does not use a predetermined rate for factory overhead. The rate is computed at the end of each month. Required Use both the direct labour hours and machine hours to compute: 1) The overhead rates for the month (5 pts) 2) The overhead cost for each job (5pts) 3) The total cost for each job (10 pts) 4) Briefly describe the difference between Job order and process costing, citing relevant examples (5 pts).

893


What are the different layers of cloud computing?

91


When usin qtp iam able to get the data from the database only in a single row that is if i have 2 columns in database,when using database output value , all the values in Database are transfered to a single row in QTP datatable. I want the values to appear as it is from the database , can anyone suggest some ideas?

860






APC L1 Visa Interview Questions
  • Dot Net AllOther (1)
  • Databases AllOther (1)
  • QA Concepts (1)
  • Oracle Apps Financial (2)
  • Electrical Engineering (6)
  • Electronics Communications (2)
  • Engineering AllOther (1)
  • Marketing Sales (1)
  • Taxation (1)
  • Call Centre AllOther (1)
  • L1 Visa (1)