Dear all i want to know FEWA Electrical Supervisor Licence test Previous Year Questions ? If any body know please send to me shibin_75@yahoo.com
1 14048Make a list of materials and layout diagram for a 35hp motor, to be wired at 35meter away from the MDB in a chemical factory.
2 4517Draw SLD for a panel has 500A Bus Bar rating, with 4 outgoing, each is 80 A (load current), showing the transformer and capacitor bank rating.
1626Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
1969Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1957Post New FEWA Interview Questions
What are different types of binding modes in WPF?
What is the difference between an application and a program?
What does owa mean in outlook?
What do you mean by android sdk?
how give earthing conection to household equipment?
Can a user run more than one db instance for amazon rds for free?
How to create your own data structure in java?
What type of data did you used?
Where is preferences in excel?
What are the benefits of measuring web traffic?
Which is better saving files in database or in file system?
What has artificial intelligence accomplished?
What are the steps involved after the disk manager passes the request?
Define quality control?
What is the difference between command line argument and input taking from the user?