A 10 MVA, 66KV, 50Hz, Y-connected 3-phase alternator has synchronous reactance of 0.635 Ù. It is working at full load at 0.8 lagging p.f. condition. Find torque angle, neglect armature resistance.
2595With a phasor diagram show the effect of increasing the field current of a generator supplying a constant real power and connected to a grid system.
1977Draw the wave shape of armature current in a generator subjected to a sudden three phase short- circuit at its terminals. Define various reactance of generator from this wave shape.
2226A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.
1920A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
2637A 500 V shunt motor runs at its normal speed of 250rpm when the armature current is 200A. The resistance of the armature is 0.12 Ω. Calculate the speed when a resistance is inserted in the field reducing the shunt field to 80% of normal value and the armature current is 100A.
2513How do the synchronizing lamps indicate the correctness of phase sequence between existing and incoming alternators?
2184Post New VECL Interview Questions
Can we change the value of static variable?
Explain the Different materials for different clothes?
Prove that the function defined in example 24 is differentiable at (0,0).
What are the unit economics? - Venture Capitalists
Define type paremeter of jquery ajax method?
How do you put a negative sign in excel?
What is lexical variable in perl?
During the opening rounds of contract negotiation, the other party uses a fait accompli lactic. Which of the following is true? A. One party agrees to accept the offer of the other party but secretly knows they will bring the issue hack up at a later time. B. One party claims the issue under discussion was documented and accepted as part of Scope Verification. C. One party claims the issue under discussion has already been decided and can't be changed. D. One party claims to accept the offer of the other party provided a contract change request is submitted describing the offer in detail.
what is the lazy design pattern?
Which date function is used in the vbscript language to find the difference between the 2 dates?
What is workflow management?
What is enhanced monitoring for rds?
What is the status code in stored procedure transformation?
What is a kafka cluster?
How many android os are there?