Answer Posted / babitha
1.Identify the customer satisfaction on our code.
2.Providing the risky items assumptions and known
constraints to customer which is a safety for us.
3.Avoiding rework on project after delivered.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
We have a directory structure /usr/local/jboss/server/{$app_name}/log/*.log which contains 1000 log files. A web application has been logging to the cloud.log file, the attempts of a user called test. The code logs the following way: log.debug(username); where the username equals “test”. What command line application and or combinations of applications will you call in order to create a file named user_log.csv that contains the following lines, where the timestamp is sorted: timestamp,username
Hi I m working as a sqa engineer and after 1 yr i want to switch to system analyst side kindly tell me how both fields relate each other and is this easy to switch job from qa to system analyst and what's the difference b/w both fields.
What is mr and what information does mr consists of?
What are the various tools you have used in testing process?
How u r estimating the budget 4 the project?
what is angle testing
Why are you in qa?
What do you understand by ‘test effectiveness’ and ‘test efficiency’?
kindly guide me about inspection process with the requried roles in detail?
What is bug leakage and bug release?
What are basic, core, practises for a QA specialist?
Why are You so sure that You are qualified enough to this SQA Tester Job?
Hi every body i am going to take the ISTQB Foundation level Exam on March 21th 2010, Could any one send some list of question papers and latest Dumps to My mail id: (saran_loyola05@yahoo.co.in). Advance thanks. Regards, Saran
What is base concept of QA against usability Issues
What is software process?