what should we do if the developer rejects the bug?
Answer Posted / indira varma
in 3 cases developer not accept with the bug
1. as per design
suppose customer make a change request in the
middle of design phase .then designer designed as per the
change req
but he is not updated the srs . developer develops based on
design .but tester writhe test case and perform testing
based on srs.because of this defect is raises. so it is not
developer fault .
2.ambiguity:
when the requirements are not clearly specified .ex
client not specified user name range.then developer
developed his own view(ex max 20).but how can know that he
takes his own rang(ex 26).because of this defect is raised
3.tester error:
tester understand functionality wrongly than he designed
wrong test cases because of this bug is found.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In cycle 1 we have 100 test cases out of which 95 test cases are PASS and 5 test cases are FAIL. So in cycle 2 how many test cases performed as a part of regression testing?
plz send the test scenarios and test cases for "user name should contain 4 to 8 chars and they should have only vowels"
What do you mean by Cause Effect Graphing? in which standard its mentioned?
what are the various techniques you will use as soon as the srs was given to you to speedup the testing?
how to indentify memory leakages after the build
What is desk checking and control flow analysis
How would you do the ollowing Security Testing for web application? 1) Authentication. 2) Authorization. 3) cookies. 4) penetration testing. 5) session testing. 6) encryption and decryption testing pls give examples give example i can't understand so pl
Define performance and stress testing?
There are some features to improve the performance of a Product. What are those factors?
What is Traditional testing & Object Oriented testing?
When should you opt for manual testing over automation testing?
Diffrence b/w functional testing,functionality testing,system testing?
What do you think the role of test-group manager should be? Relative to senior management?
Hi, This is vkram.I had completed my B.E in May 2005 & currently i am undergoing Testing Course. I want to join as a Fresher in any MNC. What should I tell why u r coming to testing field & what u did this 2 years?
Why should you care about objects and object-oriented testing?