Answer Posted / kk
yes we can weld steel for length of 5d
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
how to calculate the strength of rebound hammer test reading in building construction ?
How to design staircase.plz tell me formula for the design the staircase.
important question on stones
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
what are the changes in concrete pour height as per IS 456, 2009?
(Project Management Topic) What are the important criteria in the successful realization of the project?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover