Answer Posted / y.suresh
u are appring the AEE interview ?
Please call This number i.e. 9966077399
Is This Answer Correct ? | 61 Yes | 7 No |
Post New Answer View All Answers
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
how to shuttering is used in slab
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
In which code the the maximum height of concrete casting has been explained
important question on stones
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Describe the sections included in a typical bill of quantities
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
what is mc arther pile?