what are the basic parameters considered in designing a
pavement?

Answer Posted / dev

thicness of pavement(traffic intensity,max wheel load
etc.),no. of layers

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

3685


what are RIB slabs explain about it

2177


WHAT DLC DESIGN IN CONSTRUCTION

1639


How much is the cover for slab?

722


Why we provide hair pin for shed

1906






what is mc arther pile?

1763


Why are the bolts that hold steel rails together in oval holes?

691


Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.

1816


The largest size of paper used in plotter to print the drawing made by Autocad .

1289


how many time use of plywood shuttering and IS code

2682


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2604


For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate

1156


Please let me know what is the simplest way of Calculating Mix Designs

1506


Which IS Code/American Code applied for coupler test of steel

2170


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4452