If your current project is US based project, where will
your Business Analyst stay ? India or US ??
Answer Posted / swathi singireddy
If the client from US then mostof the Business Analyst's
resides in US and play as a on-shore team member. who
interact with the client and team members
(DEVS/TESTERS/MGRS) for the particular project through
emails/ ON CALL to review and meet the client requirements.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What is quality assurance (qa)?
What is CDB?
What is flowchart?
In practice, which life cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and system integration testing after system testing.
Please Check out and Answer the Questions in Networking section. It's argent.
What is policy?
What is end-to-end testing?
What is a user interface?
I am searching for job in s/w Testing. I completed the course, and hav 6 months exp as a Trainee Tester. I hv registered in all possible job-portals. But am nt gettin the response for that, instead i'm getting responses for my previous experience.(fyi: this is a shift in career. Earlier i worked in an international call center, which in fact was a diversion from my career). Can u giv me some suggestions as to hw to proceed? i am thinking of trying thru consultancies (i'm from Bangalore). Is there some things which i need to look out for? Plz guide me, in case i miss out on some important things. Thnx for all answers.
What is the function of the software testing tool 'phantom'?
What are the main constrains of SCSI in storage networking?
What is test result analyzer?
Which one of the following activities is the most efficient and most cost effective at identifying defects? 1. Prototyping 2. Unit test 3. Beta test 4. Design/code inspection 5. Risk analysis
What is negative and positive testing?
What is user documentation?