what are the basic parameters considered in designing a
pavement?
Answer Posted / amit
The CBR has to be between 12 and 30 . Additionally ,
compaction prior to laying a new pavement is of great
importance . In case soil is Clayey , the whole area will
need to be excavated ,removed and replaced with sandy soil.
Traffic will undoubtedly play an important role and based on
CBR and Traffic Intensity , the apprpriate curve will have
to be selected. traffic intensity will be calculated for a
period of 20 years.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
which has high compressive strength between hollow block and brick masonry?
What is the cemnent ratio
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
hi guys what happens if you are absent for a supplymentry exam?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
which type of instrument included in plumbing work?name of instrument?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
How do you calculate reinforcement weight of steel?
how is the reinforcement is distributed in triangular slab