Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is meant by Active and reactive power?

Answer Posted / nimish

The power is which is actually utilised in the circuit is
known as active power and Reactive power is the loss
occures in the system due to its inertia.

Is This Answer Correct ?    42 Yes 42 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I need to connect a synchronous generator to the grid using automatic synchronization and two circuit breakers (one for synchronization, one for end connection to the grid), how to determinate the required diameter of the cables?

2219


Why computer humming sound occurred in ht transmission line?

1126


what is smartµ grid technology?under coal gassification?

1957


Y phase plates are used in transmission line??? what is there need???

2922


The electrical energy required to raise the tempreture of a given amount water is 200 kwh. If the heat losses are 20%, the energy required is?

2007


where can the transformer having vector group Yny0 be used??

4118


Explain the different methods used in the choice of rotor slots for reduction of harmonic torques in an induction motor.

2025


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2816


what is the necessity of under ground cables ??

2079


STATE USE OF ARC RUNNERS & SPLITTERS ?

1948


please suggest some good universities with low cost iam in totally full confusion so please help me my profile gre 283 and ielts 5.5

1594


How would you relate your key competencies to this position?

2217


When we connect the large capacitor bank in series ?

1090


During regenerative breaking= A rotating magnetic field is reversed B slip is positive C torque is positive D slip is negative

2125


sir iam a 3rd yr eee student.no core company comes for recruitment to our college.my aim is to be placed in l and t.tell me the procedures.

2010