How will you go with testing process if only project
requirements document is given to you

Answer Posted / suru

After getting the project requirement details we will first
try to list out all the technical details and then prepare
Architechture design for those specifications and Put it in
to first low level design and then in to proper Code
After Coding is done we will do following
a)Unit testing --For testing code on module level
b)Integration testing --Once module are integrated to form
system
c)System Testing ---Once the subsystem are combined to from
one end to end system or applicaion
d)Acceptance Testing --Finally we will do acceptance
testing for the customer certification

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i need some objective type papers for my certification

1730


What is boundary value testing? Give an example.

684


What is white box testing?

726


What is common interface?

1491


What do you think the role of test-group manager should be? Relative to senior management?

1643






what is coupling integration testing

1619


Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.

1572


What’s the difference between a bug and a defect?

632


can anyone tell me few critical bugs in ecommerce project.

5554


tell me 3 defects in FRS document, while doing FRS review which u have found in the last 3 years ? could u plz answer brahma412@yahoo.co.in

1960


What is localization testing (l10n testing)?

721


What are all the scenario for 1.google analytics 2.api 3.paypal

1432


What r the functional testing u perform?

1623


What are quality assurance and quality control?

630


What is CVS and why it is used?

1346