what is the difference between V model and Waterfall model
used in SDLC?
Answer Posted / arun
As most of you have said, In the waterfall model each sterp
is frozen before the next step. that is the requirements
are frozen before the design starts, and once the design is
frozen the coding starts etc. But what will the testing
team do till then?????
In V model, based on the requirements the System test
cases are prepared, and based on the HLD (High level
document)the Integration Test cases are prepared, and based
on the LLD(Lowlevel document)the Integration Test cases are
prepared. and then the coding is done. once coding is
completed, unit, integration and system testing happens in
the sequence.
| Is This Answer Correct ? | 47 Yes | 13 No |
Post New Answer View All Answers
What can you tell about the project if during testing you found 80 bugs in it
1.What is bidirectional traceability ??? and how it is implemented? 2.What is Automation Test frame work ? 3. Define the components present in test strategy? 4. Define the components present in test plan? 5. Have u written Test plan ?…. thank u!plz reply........
Enlist some bug status along with its description?
name poneno dept sun 9894433467 computer This is the xls sheet a programs written to transfer this data into database write test cases and test scenario?
Give the real-time example for back-to-back testing?
When to stop testing? (Or) how do you decide when you have tested enough?
How to do Performance Testing manually for a Flash Application?
how to write test cases for epos/pos testing.
few automation basic questions One question to write a scriot in any language you know.
whar are the contents in db testing test case template
Hi could some one please send me the testplan testcases(for 2Modules) and testscripts for mercry fliht aplication or gmail. please write those on templates and send me.In testplan plase write Testobjective, test scope, est approach, exlusions assumptios.
user id @ yahoo.com (or) yahoo.co.in (or) gmail.com.... etc
what are the risk factors in the project? what is the base for testplan and entry criteria ,exit criteria for test plan?
How much the bug is affecting the functionality of the application?
What are the bugs we cannot find in black box?