Answer Posted / fayaz
relay is the switch it was re laying the eletricakl
circuit ofter every operation for next operation
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
700KW 6.6KV slip ring induction motor to use VFD to control the speed
all interview questions with answers of ntpc (2000-2009
Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing
How to calculate multiplying factor of dc energy meter
while starting a liquid starter ,is there any volage drop on water/soda on tank.can we touch the tank on starting?
What will be in Mahagenco Trade Test Exam? I want to know the same.
how much GROUND & NEUTRAL VOLT maintain in data center.
what is sevice settings for mccb?How can be it setted?
Whether amorphous core transformer is commercialized or not:Name of company making amorphous core transformer and what are different rating?
How to calculate main incomer rating of APFC Panel ? Let's say i want to find main incomer for 11kV, 1000kVAR Panel.
What do you mean by power transformer?
What are safety device in vcb and acb?
why dc is used in control circuits for MV & LV switchgeras instead of ac
Please nybody say, weather the result of Bharat Oman is declared or not? Probable date of declare???????
1. transformer design formula ? 2. how to calculate the primary turns and secondry turns ? 3. core types ? 4. how to find the primary current and secondry current ? 5. how to calculate the stacking factor ? 6. range of fulx density ?