CONSIDER A 415V/200V STEP DOWN TRANSFORMER.CAN WE USE USE
IT AS STEP UP TRANSFORMER BY GIVING 200V IN SECONDARY AND
TAKING OUTPUT FROM PRIMARY?
Answer Posted / akialok
during the design of power transformer,or any distribution
tfr the load current is taken into account ,and the windings
of the secondary side are accordingly designed that is the
load currents it can sustain ,insulation and cooling system
are taken into consideration...
suppose in your designing u r designed the windings to
sustain a 30 amp load current while reversing the windings
and taking the out put from primary as u stated, the load
current will be decreased at the 415 voltage side and the
current in the 220 voltage ll be increased to a factor of
transformation ratio as it has to work in same power..so the
windings of the 220 side may burnt out..if its not capable
of sustaining the increased current.
| Is This Answer Correct ? | 25 Yes | 6 No |
Post New Answer View All Answers
How to configure the drives in PLC, through Profibus commnication. And to how to address it?
Which motor is 3.3 or 11kV more reliable, in terms of efficeancy,maintenance, reliability.
pls,send the previous year written test questions.
What does quality factor depend on in resonance?
Make a list observation on Transformer?
hi frnds what is meant by harmonics & what is meant by third hormonics,where its will occur ?thank u
hi friends ,iam working as genset AVR service engineer in electrical field from past 2 yrs throughout india . i plan to shift in some other job without travelling in same field because i con't travel,i dont know what i do for that so please guide me what job is suited for me,how i can serch the job please anybody helpme iam totally confused
In synchronization circuit what is the function of Interposing voltage transformer(IVT)and Reverse voltage transformer(RVT)
what is mathed of check the D.C MOTOR 181 KW (ARMATURE AND FIELD) WHAT IS THE MATHED OF CHECK THE THYRISTOR MODULE (HIGH CURRENT)
what should be the acceptrd value of winding resistance for 2.5MVA transformer
why we use copper earthing for neutral while for body GI.
what is mean by kneepoint voltage? when it will happen? ( my doubt is, if CT secondary is open means ct get saturation or blas? what are factors are required for calculations? plz give currect anws:
What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?
Is there any Institution for giving M-tech in Electrical engineering for those who r in service? Give the details please.
What is meant by vector group