7)In a Banking Application, for a module to pay a bill it
must have 3 screens (Entry, verification and confirmation
screens) in series. It was found that at the final
confirmation page the data was getting saved in the database
but was not getting displayed on the screen. Which is the
best suited category and severity of this defect?
A)High severity Content issue
B)Low severity Content issue
C)High severity Data Loss
D)Medium severity data loss
Answer Posted / vishnukumar
no further action is there to continue. simply its not
getting displayed so it could be high priority and medium
seviourity bug
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
How do you estimate white box testing?
what is the difference between section & test feature in test case documention?
What is six sigma?
A form has four mandatory fields to be entered before you submit. How many numbers of test cases are required to verify this? And what are they?
what kind of testing have u done?
how to generate id in testdirector? a) Td id 1 b) td id 2 c) td id 3 d) td id 4 which is correct answer please any one of the tell me and mail me
What is formal testing?
My name is Akpos from Nigeria. I have finished manual testing course. Please, can someone advise me where to go on from here?
3. In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10%. The next £28000 after that is taxed at 22%. Any further amount is taxed at 40%. To the nearest whole pound, which of these groups of numbers fall into three DIFFERENT equivalence classes?
Describe some staff conflicts you have handled.
What are all the scenario for 1.google analytics 2.api 3.paypal
Which is the best book to ref. for design the test cases/scenario in manual testing,which gives detailed idea with all the strategies ?
What is test out put?
1.Acceptance testing involves procedures for identifying acceptance criteria for interim life cycle products and for accepting them.is that? 2.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products.is it?
How a test engineer will convince a test lead when he didn't approve the bug as a report ???