Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

wht factor are considered to design ACB( air Circuit reaker)
415V

Answer Posted / prashant pate

current rating,duty (indoor/outdoor),protections needed,
control voltage,switching mechanism,cost,Switching arcs etc.

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the ms flat constant for calculating earth mat design calculation?

2493


i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.

1906


hi can any body send me syllabus of rrb electrical section engg... and past pepar also of any board...

2654


What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?

1991


Do you need any help with FEWA Electrical Supervisor exams?

982


How to find out damper winding failure for synchronous machine?

1480


What is the pro & con of having 11kv & 33kv incoming, and what is the adv & disadv. of converting from 11kv to 33kv.

2807


what is kondo syatem in eletrical traction

2152


why we use Test Terminal Block in 11 KV and 33 KV electrical panels.

1352


is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.

1687


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

1334


Can i use the B-curve MCB instead of C-curve MCB

2003


How can we measure earthing resistance test (Earth meggar) of Transformer neutral pit while in live condition?.

2116


how to calculate

1667


there is an alternator 480 k.w, 400v,50hz, 4-wire running on load having leakage alternator body earthed current 38 A. is it within acceptable limit? if yes then give reference if no then how to bring within specified limit

1907