Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why transformer ratings in kva?

Answer Posted / ankaraju.k

At the designing of transformer you can not predict which
type of load is placed on thatone i.e; the power factor is
unknown.under no load conditions thhe transformer losses is
depend on nearly sqare of voltage.under load condition the
losses depends on sqare of current.So overall losses in
transformer is depends on voltage and current only,so yhe
rating is inKVA

Is This Answer Correct ?    74 Yes 24 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why it is not advisable to run low rating (19KVA) DG sets in parallel for long durations even though they are provided with droop ckts (QDC)

1886


How to calculate the current of Highpressure Mercury Vapour Lamp?what is the basis?whether we have to consider power factor or not?

2138


In case of salient pole alternator when number of poles are 4 or more than 4 it helps the flux wave to be sinusoid as air gap length is increased from center to tip , but if the number of poles are 2 how does the flux wave is sinusoidal?

1960


What is super thermal power plant? and how it will differ from normal thermal power plant

2268


which types of relay used in acb and vcb?

2722


How two nos. 130 kw D.C motor get synchronise using D.C drive.

2111


What is pd controller?

1092


HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.

2204


how was your last weekend.

1773


how to compute kAIC?  with formulas...

4227


what would u consider to be the basic purchase order information you would need to proceed with a cable inspection assignment?

1890


What is the two pole structure?

1919


what is advertised hop count

1759


sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.

1932


two phases with neutral supply can be taken in 3C X 10 sq.mm cable .

1402