hi Friends this is Srinivas. Can u discribe about bug
lifecycle.how to say in interview.send me my mail
:dsrao106@gmail.com
Answer Posted / ravi kiran
New
|
Open ___ Deferred
| |
___Assign ---|
| | | ___ Rejected
Reopen |
|___Test
|
Verify
|
Close
First once the bug is found it is said to be in new state,
i.e. it is not at confirmed (approved). After it is
confirmed it is assigned and then in Testing. After
verified and if fixed then the bug is Closed.
Else it is reopened and then again assigned.
After assigining some times it is deffered to other
releases or some times rejectd.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Please explain what is a relative xpath?
Please explain what is the difference between findelement () and findelements ()?
How could the web element attributes be inspected in order to use them in different locators?
I want to test a mobile software by an automation tool which is a IP telephony based software designed for both ios and android phone, basically this apps is develop for make call though few low cost audio codecs from Aircraft to Ground and Ground to Aircraft so anyone can suggest me which testing tool we can use for it
What are the steps involved in the automation process ?
what are the steps followed in unit testing, system testing, integration testing
Can you explain data-driven testing?
Is there any freeware tool for automation testing of mobile applications for BlackBerry and iPhone platforms ?
1.Which functinalities of QTP using in onlinebanking system? 2.in lift which kind of testing you perform? 3.how do you test money is transform from one account to another account in online banking?
Do you know when autoit is used?
Does every software project need testers?
if i want to use different values in datatable with each iteration of for loop what would i do ??/
HOW DO YOU PERFORM SECURITY TESTING TO VERIFY FIREWALLS,PASWORD ENCRYPTOPNS ETC?
Hi I need the following information about JMeter 1) How many(max) threads(users) can hit the website using Jmeter? 2) How long(in hours) can we run Jmeter for stress test? (Is there any “Memory full” issue if we run for long time?) 3)What typeof sampler to use for clicking on the link?
How automation process is carried out?