what is traceability matrix?is it mapping b/w the user
requirements and prepared test cases?but i want a detailed
explanation?
Answer Posted / gayathri
is a document which will be used to
verify all the requirements will have corresponding
test cases. this document will have '5' columns such as
1.S.No
Traceability matrix is a document which will be used to
verify all the requirements will have corresponding
test cases. this document will have '5' columns such as
1.S.No
2.Requirement #id
3.Description
4.Test Case Name
5.Test Case #ID.
This document should be prepared before starting the
Execution. For each and every change request, the RTM
Should need to be updated correspondingly.
By using T.M we can come to the conclusion as when complete
testing be stopped.s
Traceability Matrix Useful in following real-time situation:
1.Decide the Number of test cases are enough To test
given module.
2.To Review the Testcases .
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Do you use any automation tool for smoke testing?
What is the difference between a bug, a defect and an error?
Explain severity with example and expalin each example?
what is the most critical bug u have to find in ur project.My application is ERP based,in this purchase module is there.plz tell me the answer?
How we can test Cookies Manually?
What is Independant Testing? When and where this type of testing will be performed?
What is baseline testing?
Can any1 tell me suppose u r doing manual testing on unix platform with Shell Script, then how it is done? How u r implementing it & what is the use of Shell scripting on Manual Testing? plzzzzzzz i need ur help.
what do you mean by Develop test data through sourcing (or) handcrafting techniques
1.What is configuration Management? 2. Explain Impact Analysis 3. Explain Peer Review 4. what i kickoff phase of Formal Review. 5. Whatv are the phases of fundamental test process. 6. what is state transition testing. 7. what is LCSAJ 8. Test conditions are derived from where?
what are the tests u did in entire project? when it did in the project? (means at the release build to end of project) plz explain clearly
What does 100% statement coverage mean?
how to access a build & wat is its configuration
What is meant by entry criteria and exit criteria in software testing?
tell me 5 new requirements in ur project? plz urgent