i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Dear Sir What is the Contraction joint for base Slab
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
What are moment of inertia and its importance in civil engineering?
how to remove the quantity of metal 1 and metal 2 in concrete
what is w/c ratio in dry lean concrete for m10 mix design
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how pumping of concrete effects the quantity of material used in it?
how many spacers we need for 1 ton reinforcement? aprox.
List out some of the software program that can be useful for architect?
How to take labor charges for construction of 1cum of concrete?
how to calculate load bearing column
what is mc arther pile?