what is entry criteria for intigration testing,,?
what is entry criteria for system testing?
what is exit criteria for intigration testing & system
testing??? plz give me proper examples ....
thanks & regards
svsekhar2003@gmail.com
Answer Posted / sreedevi
Entry Criteria for Integration Testing is "All Components
have Passed in Unit Testing".
Exit Criteria is "Test Suite Passes"
ntry Criteria: The conditions that must exist before a unit
of project work can commence.
Exit Criteria: The conditions that must exist before a unit
of project work can be deemed complete.
Entry Criteria for Unit testing phase are:
The following documents have been completed, reviewed and
approved:
1. Business Requirement Document complete
2. Program Required Documents complete
3. Preliminary Software Development Project Plan
4. Phase 1 Planning
5. Functional Specification
6. High-Level Design Specifications
7. Software Development Project Plan approved
8. Software Verification Plan approved
9. Software Configuration Management Plan
10. Quality Assurance Plan approved.
Exit criteria for the Unit testing phase are:
1. Unit test has been passed
2. The module resides in a baseline directory
3. The project is code-complete. There are no missing
features or media elements
4. All priority a bug have been fixed and closed
5. Internal documentation has been updated to reflect
the current state of the product. Note: Unit testing will be
performed mostly by the Developer.
Entry Criteria for Integration testing phase are:
1. The project is code-complete. There are no missing
features or media elements
2. The product satisfies the performance and memory
requirements specified by the Functional Spec.
3. Software/Curriculum have run and passed a Sanity
Test that has been provided by the QA group.
4. All priority a bug have been fixed and closed
5. Internal documentation has been updated to reflect
the current state of the product.
6. Curriculum has done a content review of the lessons.
Exit Criteria for Integration phase are:
1. The Integration engineer has tested for install
ability.
2. All priority a bug have been fixed and closed.
3. Internal documentation has been updated to reflect
the current state of the product.
4. The Technical Lead has submitted all files for
integration accompanied by Release Notes.
Entry Criteria for System testing phase are:
1. QA has spot tested content, features, and
functionality of the product and verified that it is
feature-complete.
2. The user interface and the feature set are frozen.
3. The final CD-ROM layout has been determined.
4. The Technical Lead has submitted all files for
integration accompanied by Release Notes.
5. The Integration engineer has tested for install
ability.
6. All priority a bug have been fixed and closed.
7. Internal documentation has been updated to reflect
the current state of the product. Exit Criteria for System
testing
The Exit Criteria for the System testing phase are:
1. Final Publications Draft of product publications,
including the Quick Start Guide, has been reviewed, tested
in QA, and approved by the Core Team.
2. All priority a bug have been fixed and closed.
3. The software runs on all the product’s supported
hardware and software configurations.
4. The product is compatible with third-party products
as specified in the Functional Spec. Final Entry Criteria
The Entry Criteria for the Final phase are
1. Quality Assurance Plan approved.
2. The work has been approved and signed off by
Product Marketing
3. Final Publications Draft of product publications,
including the Quick Start Guide, has been reviewed, tested
in QA, and approved by the Core Team.
4. All priority a bug have been fixed and closed.
5. The software runs on all the product’s supported
hardware and software configurations.
6. The product is compatible with third-party
products as specified in the Functional Spec.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What are the different ways of doing black box testing?
You must test a trouble report where the problem cannot be reproduced. You tried using various test data files and mutations from the data files the customer sent along with the trouble report. The software does not fail the way it did at the customer's site.
How will you set the Dependency in the Quality center? Say if you will fail a test case and two or more test cases are dependent on that particular test case. In this case how will you handle in failing the test case.
how to test a store procedure?
What are the different cost elements involved in implementing a process in an organization?
Hi, what do you mean by internal auditing? what are the things they do in internal auditing?what they review? THNX in Advance
what is prototyping model,RAD model V model, spiral model?????
Usually customers won’t give all the requirements. How will you manage & collect all the necessary information?
what are metrics and what are metrics did u collect in you are project
write test case for linked in sign up page ?
what is meant by application server and its functions?
Define brain stromming and cause effect graphing?
Please explain me v-model clearly i want to know how it works and want to know how it use in real time on a project please tell me its urgent and important for me understand .Please tell me my mail id is Chiku_69@yahoo.in Thank u
Which is the best book to ref. for design the test cases/scenario in manual testing,which gives detailed idea with all the strategies ?
What is bug, deffect, issue, error?