what is entry criteria for intigration testing,,?
what is entry criteria for system testing?
what is exit criteria for intigration testing & system
testing??? plz give me proper examples ....
thanks & regards
svsekhar2003@gmail.com
Answer Posted / sreedevi
Entry Criteria for Integration Testing is "All Components
have Passed in Unit Testing".
Exit Criteria is "Test Suite Passes"
ntry Criteria: The conditions that must exist before a unit
of project work can commence.
Exit Criteria: The conditions that must exist before a unit
of project work can be deemed complete.
Entry Criteria for Unit testing phase are:
The following documents have been completed, reviewed and
approved:
1. Business Requirement Document complete
2. Program Required Documents complete
3. Preliminary Software Development Project Plan
4. Phase 1 Planning
5. Functional Specification
6. High-Level Design Specifications
7. Software Development Project Plan approved
8. Software Verification Plan approved
9. Software Configuration Management Plan
10. Quality Assurance Plan approved.
Exit criteria for the Unit testing phase are:
1. Unit test has been passed
2. The module resides in a baseline directory
3. The project is code-complete. There are no missing
features or media elements
4. All priority a bug have been fixed and closed
5. Internal documentation has been updated to reflect
the current state of the product. Note: Unit testing will be
performed mostly by the Developer.
Entry Criteria for Integration testing phase are:
1. The project is code-complete. There are no missing
features or media elements
2. The product satisfies the performance and memory
requirements specified by the Functional Spec.
3. Software/Curriculum have run and passed a Sanity
Test that has been provided by the QA group.
4. All priority a bug have been fixed and closed
5. Internal documentation has been updated to reflect
the current state of the product.
6. Curriculum has done a content review of the lessons.
Exit Criteria for Integration phase are:
1. The Integration engineer has tested for install
ability.
2. All priority a bug have been fixed and closed.
3. Internal documentation has been updated to reflect
the current state of the product.
4. The Technical Lead has submitted all files for
integration accompanied by Release Notes.
Entry Criteria for System testing phase are:
1. QA has spot tested content, features, and
functionality of the product and verified that it is
feature-complete.
2. The user interface and the feature set are frozen.
3. The final CD-ROM layout has been determined.
4. The Technical Lead has submitted all files for
integration accompanied by Release Notes.
5. The Integration engineer has tested for install
ability.
6. All priority a bug have been fixed and closed.
7. Internal documentation has been updated to reflect
the current state of the product. Exit Criteria for System
testing
The Exit Criteria for the System testing phase are:
1. Final Publications Draft of product publications,
including the Quick Start Guide, has been reviewed, tested
in QA, and approved by the Core Team.
2. All priority a bug have been fixed and closed.
3. The software runs on all the product’s supported
hardware and software configurations.
4. The product is compatible with third-party products
as specified in the Functional Spec. Final Entry Criteria
The Entry Criteria for the Final phase are
1. Quality Assurance Plan approved.
2. The work has been approved and signed off by
Product Marketing
3. Final Publications Draft of product publications,
including the Quick Start Guide, has been reviewed, tested
in QA, and approved by the Core Team.
4. All priority a bug have been fixed and closed.
5. The software runs on all the product’s supported
hardware and software configurations.
6. The product is compatible with third-party
products as specified in the Functional Spec.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What r the sequences that leads to automation?
What is regression testing? When to apply it?
what are the possible test cases for online jobs search portal..if its a job seeker module and any 1 if u had worked on this proj pls share the bugs with sev and priority pls frends i need replies for these queries ..thanks in advance
how many meeting in realtime environment? what are they?plz explain?
Hello, I want to know how to write a regression test plan? Can someone please send me the format/template? Thanks in advance
What do you do (with the project tasks) when the schedule fails?
What does you mean by positive and negative testing & what is the difference between them. Can anyone explain with an example?
What is an end-to-end testing?
I know functional test cases are derived from frs and system design specs. But are test cases for performance, database, boundary, relational integrity and other types of tests other than functional tests created from frs and system design specs as well? When are these test cases created? Are they in the same test plans alongside functional test cases or is their a different test plan that includes these test cases?
Hi Friends, I want to know the best institute in hyderabad which is giving training in 'SAP Testing' and who is the best faculty. Regards, Imtiyaz..
Can you explain requirement traceability and its importance?
What does entry and exit criteria mean in a project?
how will the test plan is pepared in ur organisation>?
what exactly is heuristic checklist approach for unit testing?
What criteria would you use to select Web transactions for load testing?