Answer Posted / deep
Always the system will be done after
Integration(Interface)testing,
Here we need to test performance and functionality
of the built which is integrated properly.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
what is data guidelines
What is back to back testing?
What ishigh severity, low priority bug?
wat is meant by frontend and backend testing
What are the advantages of waterfall model?
If you are handling a product testing and if there are around 100 test cases and in them few test cases are failed then at the end of the day how will you treat whether the product is pass/fail.? consider the failed test cases are in functional requirements.
Q) Create Preffered customer: As a customer when i purchase more than $5000 in goods since my first purchase, I become a preffered customer so that i can receive the benefits associated with that status.
How do u go about testing of web application?
hi this is ashok , i never worked in medical domain , can any one pls send me with proper exaple pls Question is while emergency or normal patitent enter into hospital he entered his first and last name and he enter emergency coloumn , write test case on these ,
what are the prerequisite conditins to test clientserver and web applications
Can any one give a summary of testing a territory management system? what would be the test scenarios, few test cases. how it works.
What is the difference between IE, Opera & Mozilla Firefox in web Testing and which brower will think that is much better?
do we need to write test cases for workflow of the product for instance: there is 2 module "TRAINING ASSIGN MODULE" and "EMPLOYEE" in TRAINING assign MODULE iam assigning training to employee setp is 1.selct traning "oracle" 2.select employee u want assign "peter" 3.apply. now to check whether training assign or not GOTO EMPLOYEE module 1.click on "peter" 2.click on 'view assign to employee'link.now this is a flow do i need to write test cases for this fllow.plz help me guy mail me nirmal_rawatt@rediff.com
what is the challenging position faced in the testing not in point of management point of view it must be in the point of while testing the application?
what is the test plan of facebook?