Answer Posted / amrita singh
During a scenario, you can instruct multiple users to
perform tasks simultaneously by inserting rendezvous
point.It create intense load on the server and enables Load
Runner to measure server performance.The users who arrive
at this point wait for other users to come at the point and
they simultaneously perform the task.We need to set the
following in the rendezvous policy -
Release policy - How many Vusers will be released from a
rendezvous at a time.
Timeout - How long the Controller waits before releasing
Vusers from a rendezvous
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is Standard deviation? How it will use in Lr?
What is the number of graphs you can monitor using controller at a time? What is the max of them?
What is parameterizion?
What do you mean by remote command launcher(rcl)?
What is pause command?
How can we invoke a parellel process in load runner using C or perl language?
How can we develop the database vuser script?
How do you decide the number of load generator machine required to run a test?
For what purpose, user will be using ‘continue on’ error?
What is ramp up and ramp down?
How to create a host list for a scenario?
What are the different sections of the script? In what sequence do these sections run?
What is the benefit of running a vuser script as a thread?
What is manual correlation?
What are the different components of loadrunner?