I have observed a scanrio executed/elapsed time in 16
seconds and succeded, when I set the duraion to 'Run Until
Completion'.
Same scanrio is failed/Gradually exited/stopped, when I set
the time duration for 20 seconds (after the Ramp up has
been completed). Why it is haapedned.
Can anybody tell me the answer and solution also.
Thanks in advance.
Answer Posted / sravan_tadikis
Very Simple :)
Depends on your run time settings if you have 10 iterations
then you have a setting for "RUN UNTI COMPLETION" THEN YOUR
SCENARIO WILL RUN UNTILL THE ITERATION COMPLETES. If not if
your scenario scenario setting is for run 20 munites then
it won't care about the number of iterations, it will run
only for 20 minutes.
It will execute in ths same manner.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is the loadrunner end transaction and its syntax?
When you initialize the vuser what happen?
What is parameterizion?
What kind of problem can we face regarding hardware, software, network and memory bottleneck during the performance test?
What should be done to view parameter substitution in the execution log?
What is report viewer?
What are the four selection methods when choosing data from a data file?
What is think time?
How to create a host list for a scenario?
How will you handle the situation in scripting where for your mailbox you have to select any one mail randomly to read?
How can we debug a loadrunner script?
What is the purpose of an extended log?
How to run a scenario?
What is parameterization & why is parameterization necessary in the script?
What is the difference between performance testing and performance engineering?