what is the difference b/w winding insulation class and
winding temperature class?
Answer Posted / a.hanumathu
winding insulation class is related to the capability of
short ckt of winding with other conducting part like
stator.and wndg temp class is related to ability of
conducting without melting or loose of insulation.
Is This Answer Correct ? | 11 Yes | 7 No |
Post New Answer View All Answers
What are the different types of dams?
Why two phase welding machine is used instead of three phase welding machine.
why we have and use 3 phase not 2 or 4 or other in power system?
what a function diesel generetaor turbo charger & turbo charger is more heated explain reason ?
WHY RATING OF VCB NOT LESS THAN 630A
What are the necessary solutions needed to be carried out on a malfunctioned earthing mechanism of a VACUUM CIRCUIT BREAKER.(TAMCO)
pre arcing time of ehv breaker
what is cause of static electricity? I experience shock when i touch metal equipment in a room ,furher check shows earth leakage showing 80ma at the DB near to the 400 MCCB?
WHAT IS DIFFERENCE BETWEEN MANUAL CONTROL AND MAGNETIC CONTROL AND STATE ITS ADVANTAGE /DISADVANTAGE
HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.
What is the application of Dyn1 and Dyn11 vector group of transformer?
Difference between a pilot wire and a normal conductor?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
What is the difference between security constraint unit commitment and security constraint optimal power flow?
i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected