Answer Posted / pappan
Tsunami is gain waves generated in sea due to offshore
earthquakes
| Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
How do You Maintain a structure after getting cube test of low strength.
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
pls tell me about method of cutting length of ties column
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
What is the use of water table & Kreb stone for drain
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
What is costing in 100squre feet bricks
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
What is pre-stressed concrete?
I need to constructive work in amaraj batteries