Answer Posted / archana
basically there r 5 steps of bug life cycle
1.creation:
in this step identification of bug can be done by tester
2.Assinged:
in this step the bug assinged to a developement team.
3.Evaluation:
in this step bug is evaluated which is done by developer.
it means which module or what line of codes are creating
the problem which is identified by developer.
4.Fixing:
in this step bugs r fixed and its makes change in source
repository.
5.verify:
in this step bugs r verified that bugs r fixed or not
which is conducted by testing.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Is Anyone attended the manual testing interview with capgemini in recent past. please let me know the type of questions they can ask. Thanks
Why should you care about objects and object-oriented testing?
can any one send sample test cases for database testing by taking an example? also leave emailid please. thanks (very urgent)
how mapp the defect id in quality center?
1. what is a date guidelines ?
Have u ever done testing related to a database,give examples to support u r answer.
what is a horizontal and vertical matrix explain with examples
what is prototyping model,RAD model V model, spiral model?????
Explain Single View Testing ?
wat is meant by frontend and backend testing
structure of an incident report is covered in stand for software test document IEEE 829 and is called as?
There is only requirements document. You have 10 days and 8 resources to release the system.At the end of the 8th day u tell ur TL that system is ready for release. How will you proceed with the testing process or in other words what all approach you will follow once you get requirements
What are the interview question on insurance domain in manual testing
What is a maturity level?
Name three reasons why the tester may choose to record in Context Sensitive mode.