Answer Posted / dolphin
a thyristor is a semiconductor device which have
three or more junctions like scr diac triac etc
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Dear Sir I am living in Jaipur Rajasthan now I did complete my b tech degree in electrical engineering in 2012 Sir how I gate certificate of competency for electrical supervisor
I want to know Electrical Circuit?
Why we used 690V in ACS 800 drives.Why dont use standard voltage like 415v or 1.1Kv
please give me all the Alarm .Trip ,Safety Relays & Conditions of Chiller mail me on ashokbabunhce@gmail.com
why incomer bay is required before transformer bay if there are more than 1 nos. of transformer bay.
solar energy light efficiency & disadvantages?
What will happen if the d.c. Machine is operated below rated speed?
harmonics filter
Q) Write VBscript code along with QTPscript code in QTP tool for below scenario 1. Launch yahoo site(i know) 2. Do loogin(i know) 3.Click inbox link(i know) 4.Go to every page of mail box and count no.of read mails and no.of unread mails(i know) 5.Store page numbers, read mail count and unread mail count in a new excel file sheet 6.Create 10 types of graphs on that data 7.Do logout and close site(i know) 8.Save new excel files with graph
What Is Connection APFC Panel In Compony.
In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????
we have a lot of model of rectifier but thyristor rectifier is the most rectifier that use in power system. Do you know why this rectifier is used?
Can anybody inform me about the pattern of ECIL GET( Graduate Engineers Trainee) interview for Electrical students? Will there be HR round as well? I thought of preparing for 2 to 3 subjects thoroughly. Will it be sufficient? Please share your thoughts.
What do you mean by dependent and independent voltage sources?
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?