with multiple testers how does one know which test case are
assigned to them?Folder structure.Test process
Answer Posted / &
Generally Team lead is the person who can assign the work
to the testers. Say, If you have 4 modules in ur project
and 5 testers. every module will be assign to one or two
testers which again depends on the tester experience and
knowledge on perticular domain.
The general testing process is the creation of a test
strategy (which sometimes includes the creation of test
cases), creation of a test plan/design (which usually
includes test cases and test procedures) and the execution
of tests.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
can u write some high level scenarios on ms outlook express
Hi, Anybody knows about Hexaware company..
What are the properties of a good requirement?
What is the typical situation u faced while collecting the test data?
To specify the test artifacts involved in testing.
Explain briefly your project.
when database testing comes into manual tesing
what is scrum how with ex?
how to test a store procedure?
Explain compatibility testing with an example.
What makes a good test engineer?
What are the roles of glass-box and black-box testing tools?
About Hierarchy level in your company.
Which model is following in your company for developing software?
I know functional test cases are derived from frs and system design specs. But are test cases for performance, database, boundary, relational integrity and other types of tests other than functional tests created from frs and system design specs as well? When are these test cases created? Are they in the same test plans alongside functional test cases or is their a different test plan that includes these test cases?