Answer Posted / Sanjay Kumar Dohare
There are various types of cables used in industrial applications. Some common types include: 1. Copper wire: Used for low voltage and power distribution applications. 2. Coaxial cable: Used for high-frequency transmission, such as Ethernet or television signals. 3. Fiber optic cable: Used for high-speed data transmission over long distances. 4. Multi-conductor cable: Used for control circuits and sensors, with multiple conductors bundled together. 5. Armored cable: Used in hazardous environments where cables may be subjected to physical damage.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
please send data bank of quetions answers on analytical instrumentation.
please send me some question papers of HPCL aptitude test ?? please send it to bipinb.28@gmail.com ...
Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com
hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.
Question on maha cement
sir i m preparing for BARC but i am not getting any papers to prepare for this exam so please send me some sample papers to my i.d for the preparation of barc.
any body please send me the old question papers of ongc test.
i hav applied for the post of engg. in iocl so please require the past test papers fro instrumentation engg please please help me and send me the papers or tell me the pattern and type of ques asked in examination......
pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.
Punj lloyd is coming in our Jadavpur Universtiy campus for campus placement. Please send me some hints about the writtend exam. My email id is subratafriends@gmail.com
send me model hpcl questions pleas..........my mail id mohideen.dharvesh@gmail.com
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}
any body who gone thru recent iocl interview.INSTRUMENTATION questions. I need.