adspace
Answer Posted / Rajnish Kumar
Negative feedback tends to stabilize a system by reducing the overall gain. It causes the system response to move towards equilibrium more quickly, but with smaller overshoot and damping ratio closer to 1.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
If not into production, how far did you follow the design and why did not you see it into production?
all the technical question with answers pleas send your email id ramar_eee@yahoo.com
What are the ratings of VCB, MCB, MCCB, SF6, ACB, and OCB?
Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.
how to avoid electrical shock how capacitor store charges wat are the speed control of induction motors state faradays law flemings left hand rule what is rotary converter wat is transmission and distribution what are the sources of energy abrevation of acb,vcb,sf6,igbt what is output equation of transformer which test copper iron and iron loss are calculated what is eddy current draw a single line diagram (10 marks) draw direct online starter(10 marks)
sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan
I NEED RRB SYLABUS FOR JE ELECTRICAL ,PLEASE SEND TO MY E- MAIL ID joo28_eee@yahoo.co.in
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)
i karmveer bharti persuing b.tech . plz send me syllabus and name of reference books. for preparation of section eng.
Why neutral point is consider as zero potential?
HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com
i want bhel placement paper for electrical if anybody having pl send to my id kavitha867@myway.com immediately
plz tel me syllabus and exam date 4 jr executive engg (electrical)
hello!my name is sheikh iam preparing for indian engineering servieces,please send me the old question papers..to sheikhshaazforjobs@gmail.com
How to do cable earhing? whether by grounding Armour to ground or by running extra G.I wire along with cable? which one is preferred mostly amoung them? If the second one is more preferable how many GI wires to be run along with cable (1 or 2)?