Cascade control refers to a type of control system where multiple controllers are interconnected in such a way that the output of one controller becomes the set point for another. It's used when there's a sequence or hierarchy of processes where the performance of one process affects another, and direct control would lead to instability or poor performance.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..
hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.
send me model hpcl questions pleas..........my mail id mohideen.dharvesh@gmail.com
i hav applied for the post of engg. in iocl so please require the past test papers fro instrumentation engg please please help me and send me the papers or tell me the pattern and type of ques asked in examination......
principle of dead weight tester ?
give me all the details about the interview and which type of question being asked
Questions on flow meters,few questions on HART protocol,
sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers
hye SAM acn u send your e mail id, so that i can solve my query through e mail?
please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com
can any send me a forbes marshall dtron 316 manual
hello friends, can you please send me the model paper or question paper to be prepared for hpcl examinations????????? You can mail me at rahim_here@yahoo.com waiting for your reply........... help me .. plz.....
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
DEAR SIR/MADAM MY NAME IS ARKAPROVA BHATTACHARYYA.I AM A FRESHER INSTRUMENTATION ENGINEER.CAN YOU PLEASE SEND SOME QUESTION PAPERS OF GRADUATE ENGINEER TRAINEE EXAM OF DVC(DAMODAR VALLY CORPORATION).MY EMAIL IDs ARE arka_aec@rediffmail.com.
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com