adspace


our kks tagging is crossing more than 12 character please
suggest how to take tags in the DCS

Answer Posted / Anees Ahmad

In a distributed control system (DCS), it is important to ensure that tags are unique and do not exceed the character limit. If your KKS tagging is crossing more than 12 characters, you can consider using abbreviations or acronyms to shorten the tags while still maintaining their meaning.nnFor example, instead of using a long tag such as 'Water_Level_Tank_1', you could use 'WL_TK1'. However, it is important to document any abbreviations or naming conventions used in the DCS system for easy reference and consistency.nnAnother approach could be to use a longer address structure, such as a hierarchical tagging system that separates tags into different levels. For example: 'Water_Tank' > 'Tank_1' > 'Level'.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where cascade loop use ?

1787


send me last 5 years questions asked in rrb chennai, for section engineer

2180


Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .

2581


hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.

2262


I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID

2865


Good evening all I need a small favour regarding reliance paper i wanna probable sample papers(e&i) of reliance. if any of u have any idea about dis then plz mail me back.i belongs to electronics and instrumentation engg.so i need e&i papers. thanking u....

2164


hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com

2643


please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826

2176


Questions on flow meters,few questions on HART protocol,

2088


What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.

2293


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

2196


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2260


please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com

1747


this site is owned by an nonsense

2404


can any send me a forbes marshall dtron 316 manual

2040