adspace


NSV type probe stands for

Answer Posted / Pankaj Tiwari

NSV stands for 'No Spill Vent'. This type of probe is used to vent gases or fluids from a vessel or tank without causing any spillage.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the Working principle of Dozing valve?

2292


I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..

1839


pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.

3227


plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}

2408


send me last 5 years questions asked in rrb chennai, for section engineer

2184


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2263


Punj lloyd is coming in our Jadavpur Universtiy campus for campus placement. Please send me some hints about the writtend exam. My email id is subratafriends@gmail.com

2949


hye SAM acn u send your e mail id, so that i can solve my query through e mail?

2349


Question on maha cement

810


Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .

2584


Questions on flow meters,few questions on HART protocol,

2090


please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826

2179


Sir,I am going to sit for IOCL written test exam. recently.Can anyone tell me the name of 'Objective type Question Book on Instrumentation Engineering ' which will help me. Pl. mail to bidyut_71@rediffmail.com / bidyut.saha2008@indiatimes.com / bidyut.saha09@yahoo.in

2150


please send me some question papers of HPCL aptitude test ?? please send it to bipinb.28@gmail.com ...

2077


hello can yoy pls send me previous papers of jindalpower and steel ltd.....'m from instrumentation..... mani1048@gmail.com

2080