How can we design a HVAC Plant room which includes
AHU,FCU,Chillers,Cooling towers, Pumps etc & how will they
work? any Drawing if possible?
Answer Posted / Kumara Rengeswarn
Designing an HVAC plant room involves careful planning and integration of various components such as Air Handling Units (AHUs), Fan Coil Units (FCUs), Chillers, Cooling Towers, Pumps, etc. Here's a simplified description of how they work:
1. AHU: The AHU pulls in air, filters it, conditions the temperature and humidity, and distributes it throughout the building.
2. FCU: The FCU cools or heats individual zones within the building by circulating conditioned air through a series of ducts.
3. Chiller: The chiller removes heat from the air by compressing a refrigerant to convert it into a high-pressure, low-temperature liquid, which then evaporates and absorbs heat from the air as it passes through the chiller.
4. Cooling Tower: The cooling tower cools the hot condenser water from the chiller by allowing it to come into contact with the ambient air through a series of spray nozzles or fill materials.
5. Pump: The pump circulates the chilled water, condenser water, and other fluids throughout the HVAC system.
A detailed drawing for designing an HVAC plant room requires professional engineering expertise and is beyond the scope of this response.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?
ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH
i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400
I HAVE BEEN SELECTED FOR APGENCO A.E(ELECTRICAL) 2008.HOW MUCH WEIGHTAGE FOR INTERVIEW AND WRITTEN TEST.HOW I HAVE TO PREPARE. PLEASE GIVE INFORMATION IF U KNOW.WHAT ABT G.D THIS TIME.CALL RATIO 1:2
RESPECCTED SIR/MADAM- I AM PRERING FOR SECTION ENGINEER (ELECTRICAL) RRB CHANDIGARH PLEASE SEND ME SOME PREVIOUS YEAR QUESTION PAPER OR MODEL PAPER.MY EXAM IS ON (30- NOVEMBER 2008).I AM VERY THANKFUL TO YOU. FROM- HARENDRA SINGH YADAV
kindly send me 11KV MV motor differential protection procedure by primary injection method.
when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//
send me any model test paper of clerical post of state bank of india.......
all the technical question with answers pleas send your email id ramar_eee@yahoo.com
Please nybody say, weather the result of Bharat Oman is declared or not? Probable date of declare???????
What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?
what is mean by restructuring power system?
compare between starting charactristics of synchronous motor with those of 3Q Squirrel cage induction motor
Can you used moeller lzm1 mccb in a dc system with 125vdc and 20ka short circuit current , beside is it have 24 or 48 volt shunt ? Beside how long current can through from An MCB shunt contacts? (like Z7-AS 24 V)?
WHAT IS THE MEANING OF BALANCED / UNBALANCED IN STABILIZER TYPES.