adspace


HOW can i REuse the fused MLL LAMPS & GLS LAMPS at our factory

Answer Posted / Deependra Pratap Singh Nirmal

Reusing fused MLL (Multi-Lamp Low Bay) and GLS (General Service) lamps in a factory setting is generally not recommended due to safety concerns and potential quality issues. Fuses are designed to protect the lamp from excessive current, which can cause damage or failure over time. Reusing fused lamps might compromise their safety features and could lead to electrical hazards. As for GLS lamps, they are typically designed for one-time use and may lose their lumen output and color consistency if reused.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

anyone knows service engineer in chennai for EDM SPARKING MACHINE.CHMER PULSE CD 60 M.pL GIVE ANY CONTACT NOS

2493


Enlist four components of electrive drives.

1910


i karmveer bharti persuing b.tech . plz send me syllabus and name of reference books. for preparation of section eng.

2204


plz tel me syllabus and exam date 4 jr executive engg (electrical)

2060


Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar

1969


What is the gross weight to copper ratio in slip ring induction motor of 4000 HP,6.6 kv, 372amp, 992 rpm GE motor.

2426


please send me last 5 year interview questions

2280


Why neutral point is consider as zero potential?

2747


i am in need of AC SYNCHRONUS MOTOR 30KW. ANY ONE KNOWS THE MANUFACTURER OF SAME. ALSO MOSFET AC CONVERTER 20KVA CONT.OUTPUT.

2000


please send me the previous year's question papers of jindal GET exams

5992


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1189


What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)

2251


What is the height of DA, DAL, DB, DC & DDE tower?

2460


Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0

3752


Define the overload capacity of the motor?

2139