What is Traction?
1KVA Alternator, How much urrent taken?
Answer Posted / Chhavi Garg
Traction refers to the force that propels a vehicle or other machinery. In the context of electrical engineering, traction motors are used in electric vehicles to convert electrical energy into mechanical power for motion. The 1 KVA alternator does not directly determine the current it takes, as it is a measure of the maximum power output (volt-amperes) and does not specify the current (amps). To calculate the current, you'll need to know the voltage at which the alternator operates.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How much minimum insulation required between 11kv/3.3kv transformer windings?
sir i want previous entrance exam papers for written test
Do you need any help with FEWA Electrical Supervisor exams?
Draw the line diagram of diffretial relay connected to transformer?
hello!my name is sheikh iam preparing for indian engineering servieces,please send me the old question papers..to sheikhshaazforjobs@gmail.com
I NEED RRB SYLABUS FOR JE ELECTRICAL ,PLEASE SEND TO MY E- MAIL ID joo28_eee@yahoo.co.in
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
What the main causes of transient interruptions on Over-Head Distribution Lines?
I am apply the AAI. So i want electrical sample question paper in technical with answer my id is vijayjobsmart@gmail.com
Electrical Engineering
how you will decide the distance between the power transformer and its fencing
hi friend i am going too attend for hpcl in this month please help me by sending written test question papers i am in the stream of E.E.E
what is earth fault relay 64T, why it is used in main Incomer and neutral CT of Transformer.
What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?
CBCT selection