Answer Posted / Kush Dhwaj Kumar

The correct method for outdoor termination of 19/33 KV HT cable includes isolating the line, cutting the cable, and using an insulating compound to prevent electrical leaks. This process should be carried out following safety precautions and guidelines provided in relevant standards.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hai friends i have BSNL JTO exam on next month so if any body have model question paper or give preparation tips to my mail id kumar4486@yahoo.co.in this will helpfull for my future .plz & thank u by kumar

2078


what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.

2253


i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400

2261


hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible

1918


why and how voltage sharing in transformer, during magnetic balance test ?

2443


DRAW ACIRCUIT DIAGRAM OF 100 KVA 415V/55-0-55V DELTA TO STAR TRANSFORMER

2129


What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?

3781


Do you need any help with FEWA Electrical Supervisor exams?

1087


Sir, I have applied for the of Assistant.engineer of NPDCL. please send me all AP TRANSCO AND JENCO solved papers of previous exams . I requested send me the papers to my id as soon as possible (rajanikanth_peddi@yahoo.co.in) (This is very urgent) Thank You,

2980


What types of high speed CMOS circuits have you designed?

2215


when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//

2129


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1191


I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com

1901


how to interlock 3 nos MCCBs using under voltage coil. please provide me circuit diagram?

2688


ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH

4240