adspace


Pl. brief about break-down maintenance of machine tool.

Answer Posted / Preeti Gupta

Breakdown maintenance, also known as corrective or reactive maintenance, involves repairing a machine tool after it has failed or broken down. This type of maintenance aims to restore the machine tool to its previous operational condition. Breakdown maintenance is typically unplanned and can result in downtime and increased costs due to unexpected repairs.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)

2409


if any body have question paper of railway (section engineering),then plz send me .i will thank of him/her.

2066


Hi, This is Laila. I am selected for syndicate bank interview. Could you please share your views and the questions asked if you have faced the interview My email id is laila_honey09@yahoo.com Please send as fast as u can.Thank You Thanks... Laila.

2170


please send the last 5 years {{{JUNIOR ENGINEER - ELECTICAL, ELECTRONICS RRB CHENNAI and secundrabad}}} TECHNICAL question papers TO MY EMAIL ID dinesh100701@gmail.com

2266


can you send me the placement papers of electrical engg. from companis like NTPC,DRDO,IOCL,HPCL,BPCL etc.?If,plz send as soon as possible.Thanks.

2221


what is meant by IGBT how they differ from tyristor ?

2529


I am apply the AAI. So i want electrical sample question paper in technical with answer my id is vijayjobsmart@gmail.com

2786


CBCT selection

2351


HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com

2007


TO CALCULATE THE RESISTANCE OF GRR OF HT MOTOR 400KW WHEREAS STATOR VOLTAGE 6.6KV AND ROTOR VOLTAGE 705V AND ROTOR CURRENT IS 346A.

5600


sir, I am from EEE branch.On feb 17 iam going to write an Exam for hindustan petrolium corporation Ltd.So plz send me the written exam pattern/Q's/interview questions.please mail to eee_dharmendra@yahoo.com

1932


please send me the L&T Emb. sys. placement papers and entire details of pattren

2416


hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .

2001


RESPECCTED SIR/MADAM- I AM PRERING FOR SECTION ENGINEER (ELECTRICAL) RRB CHANDIGARH PLEASE SEND ME SOME PREVIOUS YEAR QUESTION PAPER OR MODEL PAPER.MY EXAM IS ON (30- NOVEMBER 2008).I AM VERY THANKFUL TO YOU. FROM- HARENDRA SINGH YADAV

2174


i've iocl interview.. if you know the interview process please give me information..

2121