How can claculate to attain the desired PF in the line (
HOW Much KVAR is required ) Pls Give the formula? Equate
Petrochemical 0 1
how to calculate sizing of NGTR (Transformer rating,Loading
resistor value and Current rating of resistor) and what is
the X/R ratio. Details : 11kV,Capacitance 1.73532 micro
farads,40kA for 1sec. 0 1
What will happened. if we feed 3phase supplay to the stater
with out insert the rotor. How much current will flow
through the stater winnding? Equate Petrochemical 0
1
What is required of exietation to the alternater. 0
1
why star point of HT motor not earthed? Equate
Petrochemical 0 1
Why we are getting low voltage in star connection? Equate
Petrochemical 0 2
What's ND relay & it's functions? Equate Petrochemical
0 2
How instantanious short circuit current is calculated? its
formula? Equate Petrochemical 0 2
What is servo Motor? What's the advantages of this motor
over Induction motor? Equate Petrochemical 0 2
What is core CT & it's function? Equate Petrochemical 0
3
what is meant by star/delta voltages as 440/220 in a 3
phase induction motor, and why it should be connected on
STAR IN 3 PHASE SUPPLY L & T 0 4
What is required of exietation to the alternater. KNB 1
23
what is the design voltage for 6.6KV 2000 KVAR HT
capacitor? Consultancy 0 3
Pls explain about vfd control?Where it is used, Give some
example? siemens 1 22
Please explain me abt PQ diagaram in the power sector.
0 9

Answer Posted / Himanshu Tewari

To calculate the required KVAR (Kilovolt-Ampere Reactive), you can use the following formula: KVAR = (Power in kW * Power factor) / 1000. To size the NGTR (Neutral Ground Trip Relay), consider factors like voltage level, transformer rating, loading capacity, and current rating of resistors. The X/R ratio is an important parameter for short circuit analysis and stability studies in power systems. For details on how to calculate it, please consult relevant electrical engineering texts or resources.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

1055


compare between starting charactristics of synchronous motor with those of 3Q Squirrel cage induction motor

1881


I want single line diagram for AMF & DG syncronizing panel

7284


PLS SEND THE RRB CHENNAI MODEL QUESTION PAPER my email id is ganesan98655@rediffmail.com

2101


# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in

2078


how you will decide the distance between the power transformer and its fencing

2040


i've iocl interview.. if you know the interview process please give me information..

2121


kindly send me 11KV MV motor differential protection procedure by primary injection method.

1521


please send me last 5 year interview questions

2280


what is the condition for YnD11

2651


How can we calculate the motor frame sizes?

3488


WHAT IS THE MEANING OF BALANCED / UNBALANCED IN STABILIZER TYPES.

2732


what is earth fault relay 64T, why it is used in main Incomer and neutral CT of Transformer.

3872


can you plz send l&t aptitude questions if available its urgent plz plz plz

2200


two way ckt diagram can be drawn by how many ways? give diagram

1863